by wp@thefieldgroup.net | May 4, 2021 | Uncategorized
This project included replacing three existing chillers with one 300-ton and two 800-ton chillers, and rooftop cooling towers. Our team applied insulation and jacketing per specifications for new piping, pumps, valves, and equipment on time and under...
by wp@thefieldgroup.net | May 4, 2021 | Uncategorized
Highly experienced craftsmanship was required to accommodate sub-freezing operating temperatures throughout the plant during this project. Our team applied multi-layer extruded polystyrene with Mylar vapor barrier and color-coded PVC jacketing for indoor locations,...